Technical
Pumping is a very efficient and reliable means of placing concrete and sometimes is the only way of placing concrete in certain locations such as a high rise building, or large slabs where the chutes of the concrete truck cannot reach. The ease and speed of pumping concrete makes it the most economical method of concrete placement. Our vast experience and our knowledge in the concrete pumping industry allow us to readily meet the demands of any requirement scenario. Our pumps range from 16 meter to 52 meter.
![]() 16 mtr 3 section"Z" fold Output up to 90m/h |
![]() 21 mtr 4 section"ZR" Fold Output upto 100m³/h |
![]() 24 mtr 4 section"ZR" Fold Output upto 150³m/h |
![]() 31 mtr 4 section'H' Fold with Telescopic boom Output upto 164m³/h |
![]() 32 mtr 5 section"Z" fold Output upto 185m³/h |
![]() 34 mtr 4 section"ZR" Fold Output upto 164m³/h |
![]() 37 mtr 5 section"Z" Fold Output upto 185m³/h |
![]() 42 mtr 4 section"Z" Fold Output upto 163m³/h |
![]() 52 mtr 5 section"MZ" Fold Output upto 200m³/h |









